Skip to content
Father’s Day Special • Extra $150 Off • Use Code DAD26
Father’s Day Limited Offer

Because Dad Deserves Strength, Balance & Wellness. Extra $150 Off with code DAD26

Celebrate Father’s Day with a gift that supports health, movement, and daily strength. Shop in-stock PersonalHour Pilates reformers ready to ship while inventory lasts.
Extra $150 Off Code: DAD26 In-Stock Models Ready To Ship
Shop Father’s Day Sale
Country/region
Search
Cart
PERSONALHOUR INSTALLATION GUIDE

Napolie Plus Installation Guide

Follow this step-by-step guide to safely assemble your Napolie Plus Pilates Reformer. This walkthrough includes the frame setup, tower installation, spring connections, accessories, and safety recommendations.

Installation Video

Watch the full installation video before starting assembly. We recommend following the video together with the written steps below for a smoother setup process.

Important Safety Notice

Please verify all parts before installation. If any component is missing or damaged, stop assembly and contact PersonalHour support immediately.

This machine should only be used with proper understanding of Pilates equipment safety. Use carefully and preferably under qualified instructor guidance.

Included Parts

Vertical Pole × 6
Horizontal Tube × 4
Trapeze Table × 1
Single Loop Handle × 2
Spring Set × 10
U-shaped Bar × 1
Aerial Trapeze × 1
T-Pin × 2
Safety Rope × 1
Plush Handle × 2
Barrel Base × 4
Barrel × 4
Conversion Plate × 1

Step 1 — Check All Parts

01

Open the Package Carefully

Open all packaging materials and confirm all parts are included before beginning assembly. Organize the hardware and tubes in a clean open area for easier installation.

Step 2 — Frame & Barrel Setup

02

Install the Conversion Plate

Place the conversion plate onto the body frame and align it securely.

03

Attach Barrel Bases & Barrels

Install the barrel bases and barrels onto the bed legs and secure them using the included screws.

04

Install Vertical Poles

Attach the vertical poles onto the barrel sections carefully and verify all poles are aligned properly.

05

Install Horizontal Tubes

Mount the horizontal tubes onto the vertical poles using the 90° corner connections.

Step 3 — Upper Frame Assembly

06

Install Straight Clamp Tubes

Attach the straight clamp style horizontal tubes to the opposite side of the frame.

07

Connect Top Frame Sections

Secure the top frame using the remaining horizontal tubes and longest vertical poles.

08

Align All Corners

Ensure all corners are level and aligned before tightening the structure fully.

Step 4 — Push-Through Bar & Springs

09

Tighten the Frame

Tighten all four corners using the included screws and tools.

10

Install the U-shaped Bar

Secure the U-shaped push-through bar using the included T-pins.

11

Attach Springs

Install the yellow and purple springs between the body frame and push-through bar.

12

Install the Safety Rope

Thread the safety rope through the push-through bar and attach it securely to the frame spring loops.

Step 5 — Final Accessories & Handles

13

Install Aerial Trapeze Springs

Connect the blue springs between the frame loops and aerial trapeze.

14

Attach the Trapeze Table

Use the red springs to connect the trapeze table to the middle horizontal bar.

15

Install Plush Handles

Attach the plush handles securely to the vertical poles.

16

Install Single Loop Handles

Attach the yellow springs from the bar loops to the single loop handles.

Before First Use

  • Double-check all screws and frame connections.
  • Confirm springs are connected securely.
  • Inspect the push-through bar safety rope.
  • Test the carriage movement slowly before exercising.
  • Use the reformer only on a stable and level surface.
Need Installation Help?